• Home
  • Infrastructure
  • Solar Panel

Solar Panel

Solar Panel :









Solar panels were installed at DPS Dwarka in the year 2018 with the objective to save non-renewable resources of energy and shift to renewable resources.

  1. Roof Top Grid Interactive Solar Photovoltaic (PV) system (Bosch Make) 110KW.
  2. The Solar panels are installed on the main building roof to generate electricity ISES to the school.
  3. The expected energy generation can be 83 kw/day. School uses the electricity and saved electricity is supplied to BSES.