Solar Panel :

Solar panels were installed at DPS Dwarka in 2018 with the objective of conserving non-renewable energy resources and transitioning to renewable energy sources.
- A Roof Top Grid Interactive Solar Photovoltaic (PV) system (Bosch Make) with a capacity of 110 KW is installed.
- The solar panels are located on the main building roof to generate electricity for the school.
- The expected energy generation is approximately 83 kW/day. Excess electricity generated is supplied to BSES.